|  | The Whiteboard - mapping the day | 
          
            |  | Cutting steel legths for bolts | 
          
            |  | Gin Gin State School Principal  Chris
Norris grinding bolt lengths | 
          
            |  | Steel bolts ready for beds. | 
          
            |  | Cutting Sleepers to lenth | 
          
            |  | Building the Sleeper Beds | 
          
            |  | Placing Sleepers | 
          
            |  | Drilling Bolt holes | 
          
            |  | Drilling for Bolts | 
          
            |  | Bolting up the Sleeper Beds | 
          
            |  | Laying the Poly Sheets | 
          
            |  | Poly Sheet and Watering Pipe in place | 
          
            |  | Mixing the Soil.  Worm
Castings from Kookaburra Worm Farms, garden soil and Cane mill mud. | 
          
            |  | Mixing the Soil | 
          
            |  | Adding to the mix | 
          
            |  | Barrows queueing for soil | 
          
            |  | Soil to Barrows | 
          
            |  | Soil to the Barrow | 
          
            |  | From Barrows to the Wicking Beds | 
          
            |  | More Soil to the Wicking Beds | 
          
            |  | Soil in the Wicking Beds | 
          
            |  | Colin Austin from Waterright talking to the local Paper | 
          
            |  | Preparing the Straw Mulch | 
          
            |  | Mulch from Barrow to Wicking Bed | 
          
            |  | Placing the Staw Mulch | 
          
            |  | Wicking Beds! | 
          
            |  | Tidying up. |